Skip to Navigation

Determining Tensile Strengths of Large-Diameter, Synthetic Fiber Rope

30 April 2012

In 2010,  Cortland  Co.  Inc.  (Anacortes,  Washington)  was awarded an order to design and build synthetic fiber rope heavy-lift slings for installation at the London Array Phase 1, an  offshore  wind  farm  with  175  turbines  located  approximately 20 kilometers from England’s Kent and Essex coasts in the outer Thames Estuary.

Read more about the project in Sea Technology News