Determining Tensile Strengths of Large-Diameter, Synthetic Fiber Rope
30 April 2012
In 2010, Cortland Co. Inc. (Anacortes, Washington) was awarded an order to design and build synthetic fiber rope heavy-lift slings for installation at the London Array Phase 1, an offshore wind farm with 175 turbines located approximately 20 kilometers from England’s Kent and Essex coasts in the outer Thames Estuary.
Read more about the project in Sea Technology News.